Jump to content

Apple Office Fit Out

20,000 sq/ft, fast paced, Cat B fit out within an existing occupied building for Apple.

Etec Associates was appointed as MEPH Consultant for this fast paced fit out within Argyll Street, London.  The project involved extensive modifications to existing M&E systems which were generally retained throughout the space.  The existing floor void ventilation system was retained with downflow A/C units relocated as necessary.  New lighting was provided throughout which included feature lighting to the double height office space area.

  • Floor void office space A/C systems
  • Fast paced programme
  • Dedicated Comms Rooms
  • All LED lighting

Project details

Client
Apple

Location
London

Size
20,000 sq/ft

M&E Value
confidential

Architect
Apple

Project Manager

Cost Consultant

Fit out contractor
ISG Agility

M&E Contractor
Redworx

Reach out to us now Contact us

Subscribe to our newsletter

*